Ask any interior designer mid-project what takes the most time, and you’ll get the same answer: questions. Which tile goes in the guest bath? What size grout joint? What trim profile? It’s not the questions themselves that slow you down. It’s the lack of a clear, updated place to find the answers.
Most designers rely on spreadsheets or static PDFs to manage selections and specs. These documents are easily outdated, difficult to share, and nearly impossible to keep accurate once construction is underway. By the time a revised schedule makes it to site, chances are a trade has already installed the wrong spec.
And when specs change -which they often do- prices shift, lead times extend, and availability fluctuates. Static schedules just can’t keep up.
Four Stripes reimagines the Finish Schedule as a living system, not a static file. It evolves in real time with your selections and syncs automatically with the rest of Four Stripes. That means:
You’re no longer chasing down approvals or recirculating updated PDFs. When a spec changes, the system updates. When you finalize a selection, it’s logged. When a builder needs to verify a finish, the information is right there- accurate, approved, and easy to find.
The Four Stripes Finish Schedule is more than a spec sheet. It’s your single source of truth- updated, accessible, and built to move at the pace of modern projects.
And trust builds referrals. The Finish Schedule may be one of the most overlooked time-savers in interior design, but when done right, it becomes the foundation of a successful project- keeping everyone aligned, on schedule, and on point.